Charles Glass needed an uplift to his shell location. Our contractors were able to use much of the current framing to reduce costs and timing. The drywall was completed, and flooring, lighting, and signage was installed.

 

Two months of renovations yielded a brand new Commerical space fitted with all the bells and whistles. The clients were ecstatic at the speed of the repairs and the workmanship
of the crew.

 

Client: Charles Glass
Architect:
Builder: Glass Builders Inc.
Budget: $15,000